eServ Home
About eServ
eServ History
Our Customers
The eServ Difference
Lean Engineering
Methodology
eServ eOps Center
eServOnline
Competency Centers
Manufacturing Engineering
Mechanical Design & Analysis
Electrical Engineering
Aerospace Engineering
Project Experience
New Product Introduction
Cost Savings
Redesign
News
Contact Us
Manufacturing Engineering
Industry Solutions
Services & Capabilities
SAP Solutions
Case Studies
Mechanical Engineering
Case Studies
Embedded Engineering
Case Studies
Engine Support
Case Studies
Recent News & Press
BMW launches DriveNow, the 'premium' car sharing service with a Dell Streak on every dash (video)
Read more
News & Events>
Success Stories - Manufacturing
Supplier Quality
Problem Statement
Failing inspection reports were submitted by a supplier as part of the PPAP documentation
The supplier thought this was acceptable since the weld fixture was inherited from the customer
Solution
Worked with the supplier to get tooling adjusted, so parts were producted to print specifications
Worked with supplier to help them better understand PPAP requirements & purpose
Worked with supplier to show them how the weld fixture was designed to be adjusted in certain areas
Supplier made appropriate adjustments to fixture & recorded new measurements
Worked with supplier to continue making changes to the fixture until all dimensions were to print for parts coming off of the fixture
Results
Future product was to print
Passing inspection reports were submitted to the customer